中文
English

CGN New Energy Jiangsu 200MW/400MWh Rudong Shared Energy Storage Project

2024-04-12

Suhua Construction Group Co., Ltd. (Changzhou Suxing Electric Co., Ltd.), China General Nuclear New Energy Jiangsu 200MW/400MWh Rudong Shared Energy Storage Project, pre installed transformer officially delivered!


As a new type of equipment, prefabricated cabins have many advantages. It adopts a modular design, prefabricated and assembled in the factory, and then transported to the site for quick installation. This approach not only improves engineering efficiency, but also reduces the difficulty and risk of on-site construction.

Read4
share